Geely Hangzhou Bay DMA coating machine transportation project
Geely Hangzhou Bay DMA coating machine transportation project
(Summary description)
- Categories:工程案例
- Author:Geely Hangzhou Bay Second Manufacturing Base DMA Factory
- Origin:Geely Hangzhou Bay Second Manufacturing Base DMA Factory
- Time of issue:2021-02-15
- Views:0
Project Name: Geely Hangzhou Bay DMA Coating Machine Transportation Project
Project construction site: No. 888, Binhai 2nd Road, Hangzhou Bay New District, Cixi City, Ningbo City, Zhejiang Province
Project construction unit: Geely Hangzhou Bay Second Manufacturing Base DMA Factory
Production capacity: 300,000 vehicles/year (46JPH)
Project progress: The project entered the site in October 2017 and is currently in mass production
Main equipment introduction: pre-treatment electrophoresis adopts double pendulum conveying form; electrophoresis drying adopts IMC conveying, intermediate coating drying and top coat drying adopt drying double-chain conveying; bottom coating adopts aerial sliding skid + door spreader form; The spray paint adopts spray paint double chain.
Scan the QR code to read on your phone
相关案例
Changxing (Luoyang) Mechanical & Electrical Equipment Engineering Co., Ltd.
Service hotline
0086-0379-64186774
China (Henan) Pilot Free Trade Zone Luoyang Area
No. 69, Binhe North Road, Hi-tech Development Zone

Webpage Copyright(c) Luoyang AE Changxing Mechanical & Electrical Equipment Engineering CO.,LTD 豫ICP备20023227号 Powered by:300.cn