Volvo Chengdu Coating Machine Transportation and Delivery Project
Volvo Chengdu Coating Machine Transportation and Delivery Project
(Summary description)Volvo Chengdu Coating Machine Transportation and Delivery Project
- Categories:工程案例
- Author:Zhongjia Automobile Manufacturing (Chengdu) Co., Ltd.
- Origin:Zhongjia Automobile Manufacturing (Chengdu) Co., Ltd.
- Time of issue:2021-02-25
- Views:0
Project Name: Volvo Coating Machine Transportation Project in Chengdu
Project construction site: No. 368, East 7th Road, Checheng, Longquanyi District, Chengdu City, Sichuan Province
Project construction unit: Zhongjia Automobile Manufacturing (Chengdu) Co., Ltd.
Production capacity: 150,000 vehicles/year (30JPH)
Project progress: the project entered the site on July 18, 2012, and the SOP on November 1, 2013
Main equipment introduction: pre-treatment electrophoresis adopts swing-rod conveyor; electrophoresis, sealant, topcoat drying adopts drying double-chain conveying; primer adopts air skid conveying system; paint spraying room adopts spray paint double-chain; ground adopts skid conveying system.
Scan the QR code to read on your phone
相关案例
Changxing (Luoyang) Mechanical & Electrical Equipment Engineering Co., Ltd.
Service hotline
0086-0379-64186774
China (Henan) Pilot Free Trade Zone Luoyang Area
No. 69, Binhe North Road, Hi-tech Development Zone
Webpage Copyright(c) Luoyang AE Changxing Mechanical & Electrical Equipment Engineering CO.,LTD 豫ICP备20023227号 Powered by:300.cn