Great Wall Taizhou Coating Machine Transportation and Delivery Project

Great Wall Taizhou Coating Machine Transportation and Delivery Project

Great Wall Taizhou Coating Machine Transportation and Delivery Project

(Summary description)Great Wall Taizhou Coating Machine Transportation and Delivery Project

  • Categories:工程案例
  • Author:Taizhou LinkedIn Intelligent Technology Co., Ltd.
  • Origin:Taizhou LinkedIn Intelligent Technology Co., Ltd.
  • Time of issue:2021-02-17
  • Views:0
Information

Project Name: Great Wall Taizhou Coating Machine Transportation Project

Project construction site: Gaogang District, Taizhou City, Jiangsu Province

Project construction unit: Taizhou LinkedIn Intelligent Technology Co., Ltd.

Production capacity: 120,000 vehicles/year (32JPH)

Project progress: the project enters the site on April 15, 2020, and the SOP on October 15, 2020

Main equipment introduction: pre-treatment electrophoresis adopts double pendulum conveying form; electrophoresis drying adopts IMC, glue drying and topcoat drying adopt drying double chain; primer adopts air friction conveying system; spray paint adopts spray paint double chain; electrophoresis, The storage and conveying system of the friction roller bed is adopted for the storage of sealant, topcoat and empty skid.

Scan the QR code to read on your phone

相关案例

Changxing (Luoyang) Mechanical & Electrical Equipment Engineering Co., Ltd.

Service hotline

China (Henan) Pilot Free Trade Zone Luoyang Area

No. 69, Binhe North Road, Hi-tech Development Zone

Changxing (Luoyang) Mechanical & Electrical Engineering CO., LTD. Of AE

Webpage Copyright(c)  Luoyang AE Changxing Mechanical & Electrical Equipment Engineering CO.,LTD      豫ICP备20023227号        Powered by:300.cn