Geely Xi'an Coating Machine Transportation and Delivery Project
Geely Xi'an Coating Machine Transportation and Delivery Project
(Summary description)
- Categories:工程案例
- Author:Geely Motor Co., Ltd
- Origin:Geely Motor Co., Ltd
- Time of issue:2021-02-13
- Views:0
Project Name: Geely Xi'an Coating Machine Transportation and Delivery Project
Project construction site: Jingwei Middle and Small Industrial Park, Gaoling District, Xi'an City, Shaanxi Province
Project construction unit: Geely Automobile Co., Ltd. Ø Production capacity: 420,000 vehicles/year (70JPH)
Project progress: The project will enter the site on April 20, 2019, the first topcoat vehicle will roll off the assembly line on September 19, 2020, and the first electrophoresis vehicle will roll off the assembly line on October 23, 2020.
Main equipment introduction: pre-treatment electrophoresis adopts double pendulum conveying form; electrophoresis drying, glue drying and top paint drying adopt drying double chain conveying; primer adopts air friction conveying system; spray paint adopts spray paint double chain; top paint storage Rolling bed conveyor system is adopted.
Scan the QR code to read on your phone
相关案例
Changxing (Luoyang) Mechanical & Electrical Equipment Engineering Co., Ltd.
Service hotline
0086-0379-64186774
China (Henan) Pilot Free Trade Zone Luoyang Area
No. 69, Binhe North Road, Hi-tech Development Zone
Webpage Copyright(c) Luoyang AE Changxing Mechanical & Electrical Equipment Engineering CO.,LTD 豫ICP备20023227号 Powered by:300.cn